Analysis of Defense Scheme in OverLoad Shedding on 70kV Using DIgSILENT 15.1 for Enhancing the Reliability
DOI:
https://doi.org/10.69693/sustainable.v1i1.3Keywords:
Transmission Line , Over Load Shedding , Energy Not Supply , Kediri Subsystem 3,4Abstract
This research investigates the reliability of Kediri Subsystem 3,4, focusing on the impact of a Manisrejo-Nganjuk Transmission Line trip on Manisrejo-Caruban Transmission Line under normal and N-1 contingency conditions. Using Digsilent 15.1, load simulations were conducted revealing that under normal conditions, Manisrejo-Caruban Transmission Line operates at 88.92% capacity. A trip on Manisrejo-Nganjuk line could potentially overload Manisrejo-Caruban line, failing N-1 contingency requirements. To address this, Overload Shedding (OLS) was implemented on the Manisrejo-Caruban Transmission Line. Simulation results post-OLS implementation showed a reduction in line load to 64.99%, necessitating an OLS setting addition of 435.6 A. A two-stage OLS strategy was adopted: the first stage targeted OLS release at Nganjuk Substation Transformer 1, followed by the second stage at Caruban Substation Transformer 1. This effectively reduced the Manisrejo-Caruban Transmission Line load to 58.1% of its capacity. Economically, PT. PLN (Persero) benefited significantly from this implementation, saving Rp. 42,170,793 in costs. These findings underscore the efficacy of OLS strategies in enhancing system reliability and mitigating overloads, thereby optimizing operational efficiencies and cost savings for power utilities.
Downloads
References
[1] Barlian, T., Oktafiani, W. A., & Apriani, Y. (2022). Effect of Line Contingency (N-1) on the Voltage of the 70kV Palembang System Bus. Journal of Surya Energy Vol.7 No. 1, 31-39.
[2] Ahsan, M. Q., Chowdhury, A. H., Ahmed, S. S., Bhuyan, I. H., Haque, M. A., & Rahman, H. (2011). Technique to develop auto load shedding and islanding scheme to prevent power system blackout. IEEE transactions on Power Systems, 27(1), 198-205.
[3] UP2B East Java, PLN. (2023). Defense Scheme Of The East Java System. Sidoarjo: PT PLN (Persero).
[4] Ilham, W. C. (2022). Analysis of the Addition of Defense Scheme Over Load Shedding IBT 1 & 2 Pemalang to Improve the Reliability of the Pemalang Subsystem in UP2B Central Java & DIY Region. Semarang: University of Muhammadiyah Semarang.
[5] Samsurizal, S., Fikri, M., Makkulau, A., & Pasra, N. (2024). Pengaruh Ketidakseimbangan Beban Terhadap Arus Netral Pada Transformator. TELKA-Jurnal Telekomunikasi, Elektronika, Komputasi dan Kontrol, 10(2), 134-143.
[6] Putri, R. A. (2023). Design of Over Load Shedding Scheme Against Contingency (N-1) at IBT 150/70kV Tasikmalaya. Bandung: University of Education Indonesia.
[7] UP2B JAVA BALI. (2013). Guidelines and Guidelines for Transmission Protection Systems and Substations in Java and Bali. Jakarta: PT PLN (Persero).
[8] Samsurizal, S., & Hadinoto, B. (2020). Studi Analisis Dampak Overload Transformator Terhadap Kualitas Daya Di PT. PLN (Persero) Up3 Pondok Gede. Kilat, 9(1), 136-142.
[9] Aksan, F. N. (2021). Studi Rekonfigurasi Sistem Distribusi Pada Jaringan 20 kV Dengan Metode Simple Branch Exchange Pada Penyulang Cempaka. EPSILON: Journal of Electrical Engineering and Information Technology, 19(2), 45-52.
[10] Samsurizal, S., & Fadli, Y. D. (2021). Relokasi recloser dengan metode section technique Pada Jaringan distribusi 20 kv. Sutet, 11(1), 13-24.
[11] Jung, J., Liu, C. C., Tanimoto, S. L., & Vittal, V. (2002). Adaptation in load shedding under vulnerable operating conditions. IEEE Transactions on Power Systems, 17(4), 1199-1205.
[12] Dola, H. M., & Chowdhury, B. H. (2006, June). Intentional islanding and adaptive load shedding to avoid cascading outages. In 2006 IEEE power engineering society general meeting (pp. 8-pp). IEEE.
[13] Muhammad, A. H., Irnawan, R., & Mochammad, R. F. (2024, October). Defense Scheme of Interconnection System: A Design Review. In 2024 16th International Conference on Information Technology and Electrical Engineering (ICITEE) (pp. 312-317). IEEE.
[14] Toro-Mendoza, M. A., Segundo-Ramírez, J., Esparza-Gurrola, A., Visairo-Cruz, N., Guitiérrez, C. A. N., & Pérez-Negrón, C. (2023). Toward Adaptive Load Shedding Remedial Action Schemes in Modern Electrical Power Systems. IEEE Access, 11, 111011-111033.
[15] Shekari, T., Aminifar, F., & Sanaye-Pasand, M. (2015). An analytical adaptive load shedding scheme against severe combinational disturbances. IEEE Transactions on Power Systems, 31(5), 4135-4143.